Site Preparation

We know every project and every client is different. There’s no one-size-fits-all approach, which is why we’ve made it as simple as possible to contact us in the way that works best for you.

Can drainage and site works be carried out alongside piling?

Yes. These works are often coordinated to improve efficiency and reduce overall programme time.

What does site preparation include?

Site preparation may include excavation, reduced level digs, formation works, access preparation, and spoil removal.

Do drainage works require Building Control approval?

Yes. All drainage works must comply with Building Regulations and are inspected where required.

What is a soakaway and when is it required?

A soakaway allows surface water to disperse naturally into the ground and is typically required where connection to a surface water sewer is not available.

Can existing drains be diverted or replaced?

Yes. Drain diversions are commonly required as part of extensions, new builds, and foundation works.

What drainage services do you provide?

We install foul water and surface water drainage, soakaways, drainage diversions, and associated groundworks.

Can’t find the answer you’re looking for?

Every site and project is different. If you still have questions or would likeadvice based on your drawings or site conditions, please contact our teamand we’ll be happy to help.

Contact Us
Icon

Subheading one

3
2
3
2
1
,
.
.
.
.
.
6
2
3
2
1
0
7
8
3
9
0
2
6
3
8

Residential piling jobs we’ve
completed over the years.

About mini piling

Why Clients Choose Capital Piling

Fully insured piling and groundworks contractor

Engineer-designed and Building Control–approved works

Experienced in residential and commercial projects

Clear, transparent communication from enquiry to completion

Help Center

Visit our Help Centre for guidance on piling, groundworks, and the quotingprocess.

Visit help center