Programme Planning

Why programme planning is essential for a smooth and efficient driven piling contract

Programme planning for SCD driven piling is not something that can be left to the week before the rig arrives. The sequencing of activities, the logistics of concrete supply, the management of noise and vibration constraints, the coordination between the piling programme and the groundworks that follow, and the time needed for testing and record submission all need to be thought through and documented before installation begins. A well planned programme runs efficiently, delivers predictable outcomes, and gives the main contractor and client the confidence they need to plan the rest of the construction sequence around the foundation works. We work through the programme planning process with clients and structural engineers at the pre-construction stage on every project, and for those without a structural engineer in place our in house team can manage the full process from design through to programme delivery.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Are you struggling to find the answer you’re looking for?

Every site and project is different. If you still have questions or would like advice based on your drawings or site conditions, please contact our team, and we’ll be happy to help.

Contact Us
Icon

Subheading one

3
2
3
2
1
,
.
.
.
.
.
6
2
3
2
1
0
7
8
3
9
0
2
6
3
8

Residential piling jobs we’ve
completed over the years.