Project Description
The project involved the construction of a substantial outbuilding within a residential setting, requiring a foundation solution that combined structural reliability with efficient installation.
SFA Open Bore piling was selected as the primary methodology, with piles installed to an average design depth of approximately 10 metres to achieve the required load-bearing capacity. Anti-heave slip sleeves were incorporated to each pile position as part of the foundation strategy, providing protection against potential ground movement.
Prior to piling works, site preparation was undertaken to ensure safe and efficient access for plant and equipment. Following pile installation, an 80m² reinforced concrete raft slab was constructed in accordance with the engineer’s specification, creating a stable and integrated foundation platform for the new structure. Anti-heave precautions were also incorporated beneath the slab to enhance long-term performance.
Project details
Date :
July 2025
Methodology:
SFA Open Bore Piling
Service type :
Residential
Location :
Buckinghamshire
About the Project
Capital Piling was appointed to deliver a piled foundation solution for a new outbuilding at Aylwards Rise, Stanmore, Greater London.
The works comprised one day of site preparation, followed by the installation of 9 No. 300mm diameter SFA Open Bore piles and the construction of an 80m² reinforced concrete raft slab (225mm thick), forming a complete structural foundation system.
Full engineering design was included for both the piling works and the reinforced concrete raft.
Project Summary
Delivered in July 2025 this project involved site preparation, the installation of 9 No. SFA Open Bore piles and the construction of a 225mm thick reinforced concrete raft slab. Capital Piling provided a coordinated design-and-install foundation package, ensuring structural integrity and efficient programme delivery for this residential outbuilding in Stanmore, Greater London.
“In few week with Focus, we achieved more than what we previously did in 8 months.”
- John doe, Head of development group
Let’s talk about your project
Whether you’re ready to proceed or still exploring options, our team is here tohelp you move forward with confidence.
Share your project details
Why contact us
No obligation — just clear, honest advice
Reviewed by an experienced piling specialist
Suitable for domestic and commercial projects

Prefer to speak to us directly?
frequently asked questions
What is piling?
Used for a variety of building projects, piling involves placing reinforced concrete 'piles' in the ground to form a strong foundation.
Do you offer quotations / price match quotes?
We are more than happy to provide a quote on any work that we provide. We will also aim to match the quotation of any legitimate competitor so that you get the best price. Please get in touch for your no-obligation quotation by calling 0333 202 6412.
When can you start/finish work?
Availability depends on the size and scope of your project. Please contact us to discuss your timeline, and we’ll do our best to accommodate your schedule.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.