Project Description
About the Project
This project formed part of a new build residential development set behind existing housing, with access and working space limited throughout.
The foundation design required a piled solution to support the proposed structure. Steel Cased Driven piles were used to provide a consistent and reliable installation method suited to the ground conditions and site layout.
Once piling was complete, a reinforced concrete raft slab was constructed across the pile layout to tie the system together and distribute loads evenly across the foundation.
The works were carefully sequenced to suit the restricted nature of the site, with close coordination to ensure safe access, efficient installation and steady progress.
Project details
Date :
25/11/2024
Methodology:
Steel Case Driven Piling
Service type :
Location :
Surrey
About the Project
Piling and foundation works carried out for a residential backland development at the rear of Mansfield Close, North London.
The scheme involved the construction of new residential units, requiring a piled foundation solution due to ground conditions and site constraints. Our scope included the installation of 45 Steel Cased Driven piles, followed by the construction of a 228 square metre reinforced concrete raft slab at 250mm thickness.
Working within a confined site surrounded by existing properties, the piling method was selected to allow for controlled installation while achieving the required load capacity.
Project Summary
Piling and raft foundation package for a residential backland development in North London.
Installation of 45 Steel Cased Driven piles and construction of a 228 square metre reinforced concrete raft slab at 250mm thickness.
Works completed within a constrained site, providing a stable foundation system for new residential units.
“In few week with Focus, we achieved more than what we previously did in 8 months.”
- John doe, Head of development group
Let’s talk about your project
Whether you’re ready to proceed or still exploring options, our team is here tohelp you move forward with confidence.
Share your project details
Why contact us
No obligation — just clear, honest advice
Reviewed by an experienced piling specialist
Suitable for domestic and commercial projects

Prefer to speak to us directly?
frequently asked questions
What is piling?
Used for a variety of building projects, piling involves placing reinforced concrete 'piles' in the ground to form a strong foundation.
Do you offer quotations / price match quotes?
We are more than happy to provide a quote on any work that we provide. We will also aim to match the quotation of any legitimate competitor so that you get the best price. Please get in touch for your no-obligation quotation by calling 0333 202 6412.
When can you start/finish work?
Availability depends on the size and scope of your project. Please contact us to discuss your timeline, and we’ll do our best to accommodate your schedule.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.
Do I need to hire any additional equipment?
No. We will supply or arrange for all the essential equipment and supplies.